Speedy Juanito
It took me three or four days to get the back third of the roof ready for rain. But yesterday and today i got the front third of our roof mostly waterproof, ready for modest rain, and almost ready for shingles. Woot woot. That's me being excited, while being sore and exhausted.In case you want to redo the roof on your house, let me recommend a proper shingle ripper (or a flat bladed shovel with notches cut in the blade) and "roof jacks" which hold a board so you can stand on something while working on the roof. And drink lots of water.